{"id":3392,"date":"2024-07-12T09:07:21","date_gmt":"2024-07-12T09:07:21","guid":{"rendered":"https:\/\/www.cervitech.nl\/?post_type=projecten&p=3392"},"modified":"2024-10-07T11:15:46","modified_gmt":"2024-10-07T11:15:46","slug":"relox-rto-bij-berry-global-hardeberg","status":"publish","type":"projecten","link":"https:\/\/www.cervitech.nl\/en\/projecten\/relox-rto-bij-berry-global-hardeberg\/","title":{"rendered":"CERVITECH\/RELOX RTO at Berry Global Hardenberg"},"content":{"rendered":"

At Berry there is an old afterburner on the roof that no longer meets the current requirements in terms of emissions and energy. In the preliminary phase, CERVITECH BV conducted a study in production and combined this with plans for the future.<\/p>\n\n\n\n

This research was the starting point of the final project. This project not only consists of supplying the new Regenerative Thermal Oxidizer (RTO), also called an afterburner, but also of optimizing the production equipment, designing the assembly of production machines, piping, valves and the RTO and putting the entire assembly into production.<\/p>\n\n\n\n

Phase 1<\/strong>
A blueprint of the factory is created through various flow and concentration measurements on various product machines, which are linked to the old RTO. Based on these measurements, an accurate picture of the current situation is recorded.<\/p>\n\n\n

\n
\"\"
The foundation on the roof is ready. <\/figcaption><\/figure><\/div>\n\n\n

Phase 2<\/strong>
This phase involves developing a plan to improve the process values as measured in Phase 1. In addition to making this plan, it will also be implemented. By executing, a new blueprint is created with new values for both flow and concentration.<\/p>\n\n\n\n

Phase 3<\/strong>
Determine what the capacity of the new RTO will be with the input of parameters and the values that were previously determined. In this phase, the complete project plan has been developed in terms of project matters and schedules.<\/p>\n\n\n\n

Phase 4<\/strong>
In this phase, the realization of the project plan begins until the actual installation of the new RTO. For example, a new foundation will be placed on the roof so that the new RTO can be placed on it and the old valve motors will be replaced by fail-safe motors. Cervitech also supplied this.<\/p>\n\n\n\n

Phase 5<\/strong>
Installing and fully connecting the RTO to the foundation on the roof.<\/p>\n\n\n\n